Roads and Maritime Services is advising motorists changed traffic conditions will be in place from late this month on the Moruya River Bridge on the Princes Highway.
Work to repair bridge joints will be carried out from Sunday 29 April to Thursday 3 May between 7pm and 6am, weather permitting.
Changed traffic conditions including lane closures and a reduced 40 km/h speed limit will be in place during work hours for the safety of workers and the community.
Motorists are advised to allow up to five minutes of extra travel time and should drive to the conditions and follow the directions of traffic control.
Roads and Maritime thanks motorists for their patience during this time.
For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.
Photo by Moruya Waterfront Hotel Motel