top of page
Screenshot 2023-06-13 180949.png
Writer's pictureThe Beagle

Changed Traffic Conditions At Tuross Head Turnoff May 2nd


Roads and Maritime Services advises motorists changed traffic conditions will be in place next Wednesday on the Princes Highway.

Geotechnical investigation work will be carried out at the intersection of the highway and Hector McWilliam Drive at the turnoff to Tuross Head.

Work will take place on Wednesday 2 May between 8am and 5pm, weather permitting, and is part of the Australian Government’s $9 million Eurobodalla Roads Upgrade Package.

Temporary traffic changes will be in place while work is carried out, including the closure of the left turning lane from the Princes Highway into Hector McWilliam Drive.

A reduced speed limit of 40 km/h will also be in place during work hours.

Motorists will be able to turn left into Hector McWilliam Drive from the through travel lane and traffic controllers will be on site for the safety of workers and motorists.

Motorists are advised to drive to the conditions and follow the directions of signs and traffic control. Roads and Maritime thanks motorists for their patience while this work is carried out.

For the latest traffic updates download the Live Traffic NSW App, visit livetraffic.com or call 132 701.

NOTE: Comments were TRIALED - in the end it failed as humans will be humans and it turned into a pile of merde; only contributed to by just a handful who did little to add to the conversation of the issue at hand. Anyone who would like to contribute an opinion are encouraged to send in a Letter to the Editor where it might be considered for publication

buymeacoffee.png
bottom of page